| APL-SB14 |
Sealing of Blade Assemblies to Prevent Water Ingress into Hub |
| APL-SB13 |
Addition of O-Ring Seal to Blade Retention Nut to Prevent Water Ingress into Hub |
| APL-SB12 |
Improved Procedure for Lubrication of Blade Assemblies |
| APL-SB12a |
(Improved Procedure for Lubrication of Blade Assemblies) Amendment to Operator's Manual |
| APL-SB9 |
Upgrade to AC200 SmartPitch Controller |
| APL-SB8 |
Upgrade of Pitch Change Motor Brushes and Springs |
| ATL-SB7 |
Addition of Light Shield to Sensor |
| ATL-SB6 |
Replacement of Speed Encoder Transfer |
| ATL-SB5 |
Adjustment of Speed Regulator within Automatic Controller |
| ATL-SB4 |
Locking of Coarse Pitch Position Micro-Switch Retaining Screws |
| ATL-SB3 |
Inspection of Wiring for Pitch Control Motor |
| ATL-SB-2 |
Prevention of Water Ingress into Hub |
| ATL-OM308 |
Operators Manual for AP308 (This file is ~0.7Mb and may take some time to download |